Call Us: +8613573317266Email: 947633108@qq.com
enLanguage

Mechanical installation of vacuum pump

Aug 01, 2022

(1) The vacuum pump should be installed in a place with a solid ground, and there should be enough room around it for easy inspection, maintenance and maintenance.

(2) The foundation should be kept level under the base of the vacuum pump. It is recommended to cushion the four corners of the base with shock-absorbing rubber or cast and install with bolts to ensure that the vacuum pump runs smoothly and has little vibration.

(3) The connection pipeline between the vacuum pump and the system should be sealed and reliable. For small vacuum pumps, metal pipelines can be used to connect the gasket and oil-resistant rubber. For small vacuum pumps, vacuum hoses can be used to connect. And less elbows. (When welding the pipeline, the welding slag in the pipeline should be removed, and the welding slag is strictly prohibited from entering the vacuum pump chamber.)

⑷In the connecting pipeline, the user can install a valve and a vacuum gauge above the air inlet of the vacuum pump to check the limit pressure of the vacuum pump at any time.

⑸ Connect the power supply according to the regulations of the motor plate, and install the fuse and thermal relay of appropriate specifications.

⑹ When the vacuum pump is energized for trial operation, the motor belt must be removed, and the vacuum pump can be put into use after confirming that the rotation of the vacuum pump meets the specified direction, so as to prevent the vacuum pump from reversing oil injection. (Turn to the direction indicated by the protective cover)

⑺ For the vacuum pump with cooling water, connect the cooling water according to regulations.

⑻ If a solenoid valve is installed at the vacuum pump port, the valve and the vacuum pump should act at the same time.

⑼ When the exhaust gas from the vacuum pump affects the working environment, a pipeline can be installed at the exhaust port to lead away or an oil mist filter can be installed.